    Référence: 20230668
    Date de publication: 4 septembre 2024

    Promoteur – Intermédiaire Financier

    Not disclosed.

    Lieu

    Description

    The scope of the project consists of the renovation of the Terminal 1 complex, electrification of airport ground handling operations and other decarbonisation measures. Works consist of: i) renovation of Terminal 1 services building; ii) renovation of the utilities' equipment and plants in Terminal 1, in operation since 1972, iii) installation of electric vehicle charging points in the airside area; iv) acquisition of a fleet of electric ground handling equipment and (airside) vehicles; and v) replacement of existing lighting systems by LED lighting in buildings and on the aircraft parking apron, and vi) installation of photovoltaic panels.

    Objectifs

    Upgrade of existing infrastructure and utility networks and contribution to the company's decarbonisation plan, aiming to decrease carbon emissions to reach the "Net Zero" Emissions by the end of 2045.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    not disclosed

    Coût total (montant approximatif)

    not disclosed

    Aspects environnementaux

    A number of components included in this project might fall under Annex II of Directive 2011/92/EU amended by the Directive 2014/52/EU (EIA Directive), meaning that the Competent Authority makes the decision as to whether a formal environmental impact assessment (EIA) is required or not. This, and the status of any existing development consents, will be reviewed and assessed during project appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation: Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    À l'examen - 20/03/2024

    Milestone
    À l'examen

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Transports