Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20230383
    Date de publication: 21 septembre 2023

    Promoteur – Intermédiaire Financier

    FIRSTRAND BANK LTD

    Lieu

    Description

    The facility will provide funding to FirstRand Bank Limited (FRB) to support the development and upscaling of solar photovoltaic and wind renewable energy investments in South Africa, in line with the EIB Climate Action eligibility criteria.

    Objectifs

    The aim is to enhance access to finance for independent power producers operating in South Africa to implement low-carbon and climate resilient project, which will lead to a substantial reduction of carbon emissions.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 400 million

    Aspects environnementaux

    The operation intends to generate environmental benefits by supporting renewable energy (i.e. solar photovoltaic projects, onshore wind) schemes that help to mitigate climate change. The underlying schemes would fall under the Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending Directive 2011/92/EU), if located within the EU, requiring the competent authorities to determine whether an environmental impact assessment is required. In such case, the Borrower will ensure that an Environmental and Social Impact Assessment is carried out and that public consultation is undertaken in accordance with national legislation and the EIB environmental and social standards. The EIB will assess the capacity and procedures of the Borrower to ensure the underlying schemes' compliance with national environmental, social and biodiversity regulations, as well as with the EIB's environmental and social standards.

    Passation des marchés

    The EIB will require the Borrower to ensure that implementation of the underlying schemes will be done in accordance with the EIB's Guide to Procurement.

    Statut

    Signé - 8/07/2024

    Milestone
    À l'examen
    Approuvé
    Signé
    6 février 2024
    8 juillet 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Afrique du Sud Énergie