    Référence: 20230224
    Date de publication: 4 décembre 2023

    Promoteur – Intermédiaire Financier

    AEROPORTO VALERIO CATULLO DI VERONA VILLAFRANCA SPA

    Lieu

    Description

    The project will finance the operational resilience and safety and security investments under the Verona airport 2015-2030 masterplan. In detail, it concerns: i) the reorganisation and rehabilitation of the aircraft parking apron; ii) the upgrade of the airside area in order to comply with the latest safety and security regulations; iii) the construction of new rescue and firefighting facilities; iv) the reconstruction and upgrade of the baggage handling system to the latest standards.

    Objectifs

    The aim is to improve the operational resilience and the maintenance of the highest safety and security standards at an airport infrastructure belonging to the Trans European Network Transport (TEN-T) network of airports.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 100 million

    Aspects environnementaux

    The scope of the project is a part of the airport's development masterplan that was subject to an environmental impact assessment in line with the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending the EIA Directive 2011/92/EC) on the assessment of the effects of certain public and private projects on the environment (EIA Directive). An EIA decision was issued by the Competent Authority.

    Passation des marchés

    The promoter has been assessed by the EIB as being a public concessionaire not operating in the utilities sector and therefore being subject to comply with the EU Public Procurement Directives. The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 23/11/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    12 septembre 2023
    23 novembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).