Date de publication: 10 octobre 2023
Promoteur – Intermédiaire Financier
VLAAMSE MAATSCHAPPIJ VOOR WATERVOORZIENINGLieu
Description
The project concerns the extension and rehabilitation of the water supply network of De Watergroep, the largest drinking water company in Flanders, Belgium. This is part of the company's 2023-2028 investment programme.
Objectifs
The aim is to replace outdated water distribution infrastructure, upgrade the water supply network and enhance its water and energy efficiency. The investments will thus make the water supply more resilient to climate change and support climate change mitigation. Additionally, by improving the water supply services quality, efficiency and affordability, the investment will enhance the quality of life of the 3.3 million people living in the serviced area.
Secteur(s)
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Montant BEI envisagé (montant approximatif)
EUR 350 million
Coût total (montant approximatif)
EUR 769 million
Aspects environnementaux
The promoter will be required to implement and operate the investments in conformity with national laws, as well as the EIB's environmental and social standards. The project will support compliance with key EU directives in the water sector notably the Drinking Water Directive (2020/2184/EU) and the Water Framework Directive (2000/60/EC). The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation. Most of the components to be financed under the investment loan are expected to have limited environmental and social impacts. However, some of the investments may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. Where a formal EIA is required, a copy of the Environmental & Social Impact Study or the Non-Technical Summary (NTS) or equivalent document will be provided to the Bank, and published on its website. The Promoter will also be required to verify that all of the schemes submitted for financing by the Bank follow the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC. For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank information on the mitigating measures required to comply with the Habitats and Birds Directives. The promoter's capacity to ensure that the schemes are in compliance with the EIB's environmental and social standards will be verified at appraisal.
Passation des marchés
The EIB will require the promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.
Statut
Approuvé - 23/07/2024
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).