Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20230044
    Date de publication: 14 novembre 2023

    Promoteur – Intermédiaire Financier

    REGION DE BRUXELLES CAPITALE,SOCIETE DES TRANSPORTS INTERCOMMUNAUX DE BRUXELLES

    Lieu

    Description

    The project will support the implementation of Phase I of the metro line 3 (M3) which consists of upgrading the existing tram infrastructure (pre-metro) into a fully-fledged metro line in the central underground transport corridor between Albert and Gare du Nord (6km), in Brussels. This is part of a wider programme of strategic transport investments carried out by the 'Région de Bruxelles Capitale (RBC)' to modernise the existing public transport infrastructure and fleets, as well as to extend the network.

    Additionality and Impact

    The project will increase the quality and appeal of public transport services to bring about the modal shift targeted in the Brussels region's strategic documents.

    The investments to be financed will carry benefits by improving the quality of service provided in terms of comfort, availability and reliability on the core section of the public transport network between Brussels-North and Albert, especially during peak hours, through an increase in capacity. This contributes to a modal shift towards the public transport network.

    Other benefits of the project include lower overall transport costs for passengers, lower operating costs and a reduction in the main negative externalities of transport, particularly in terms of greenhouse gas emissions, noise and atmospheric pollution, and road accidents.

    In addition to the economic benefits mentioned above, the project will have a social impact by improving access to employment, education and facilities, and will contribute substantially to making public transport more affordable, accessible and sustainable in the Brussels region.

    The promoter has the necessary expertise to implement the components of the project. There will be annual follow-ups on project progress.

    Financially, the operation will ensure that RBC has access to sufficient and stable financial resources for the timely implementation of the project. The Bank provides flexibility in terms of availability and grace periods, allowing RBC to spread out its investments over the planned construction period. The Bank´s provision of a 25-year-financing increases the stability of the management of the Borrower´s long-term obligations. In addition, EIB´s financing contribution will underpin the investment grade profile of the region, acting as a catalyst for crowding in other possible financiers.

    Objectifs

    The loan will support the implementation of the Sustainable Mobility Plan for Brussels Region and will contribute to improving quality, reliability, capacity, safety and accessibility of the public transport services, thus favouring the use of public transport and promoting intermodality and modal transfer away from private cars as well as improving energy efficiency.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 475 million

    Coût total (montant approximatif)

    EUR 1660 million

    Aspects environnementaux

    The promoter's environmental and social management capacity to apply the relevant EU Directives will be verified during appraisal, particularly with regard to the EU Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by 2014/52/EU), EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC as well as public consultation.

    Passation des marchés

    The promoter has to ensure that contracts for the implementation of the project have been and will be tendered in accordance with EU procurement legislation, 2014/25/EU or 2014/24/EU where applicable as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 21/12/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    13 décembre 2023
    21 décembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Belgique Transports