    Référence: 20220845
    Date de publication: 20 mars 2023

    Promoteur – Intermédiaire Financier

    ROMANIA

    Lieu

    Description

    The project concerns the construction of about 42 km of the new greenfield A3 motorway between the towns of Nadaselu and Poarta Salajului in the Northwest of Romania, which is part of the comprehensive Trans-European Transport Network (TEN-T).

    Additionality and Impact

    The proposed project concerns the construction of 42 km of a new greenfield section of the A3 motorway between the towns of Nadaselu and Poarta Salajului in the Northwest of Romania.

    The Project is located on the comprehensive TEN-T Network in a Cohesion region of Romania (NUTS RO113 and NUTS RO116). The Project addresses the market/network failure related to accessibility along the comprehensive TEN-T Network. The project is expected to generate economic benefits from time savings, safety improvements and vehicle operating cost reductions.

    The project benefits from PASU (Project Advisory Support Unit) Technical Assistance to the Managing Authority. In addition to the project advisory support, the EIB loan at more favourable conditions in comparison to the financial market, in particular longer tenors and lower interest rate will have a significant impact on the operation. The EIB loan is expected to leverage RRF funds amounting to EUR 261m thus contributing to the project acceleration.

    Objectifs

    The project will generate multiple economic benefits, notably in terms of time saving, safety improvement and vehicle operating cost reduction.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 698 million

    Aspects environnementaux

    The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and a mandatory EIA Report was elaborated. The Environmental decision was issued by the competent authority in November 2017. The project alignment does not cross any Natura 2000 sites and is situated in the vicinity of one Natura 2000 site, ROSCI0209 Racâs - Hida, located 4km from the project. The Appropriate Assessment was carried out in September 2016. Land acquisition is already completed and paid. The implementation of the EIA and Habitats Directives requirements will be analysed during the appraisal of the project.

    Passation des marchés

    All the contracts have been awarded and signed with no litigation issues concerning these tender procedures. The works have started in May 2021. The Bank will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 20/11/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    3 mai 2023
    20 novembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Transports