Date de publication: 15 juin 2023
Promoteur – Intermédiaire Financier
ENEL CHILE SALieu
Description
The operation is an allocation under the Framework Loan ENEL ENERGY EFFICIENCY & RENEWABLES FL (LATAM) (2020-0823) approved by the Board of Directors on 17.11.2021 (CA/548/21) supporting the development of renewable energy generation in Chile.
Objectifs
The project consists of the construction and operation of the Guanchoi solar photovoltaic project in Chile (formerly known as Campos del Sol II), for an expected new generation capacity of ca. 398 MWp and its scope includes some ancillary infrastructure such as the substation, main access roads and high voltage transmission line.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
USD 243 million (EUR 221 million)
Coût total (montant approximatif)
USD 324 million (EUR 294 million)
Aspects environnementaux
The project will generate environmental benefits, by supporting new renewable energy generation capacity that help to mitigate climate change. If the renewable energy plant was located within the EU they would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU, requiring the competent authorities to determine whether an EIA is required. Following Chilean national legislation, an Environmental Impact Statement is mandatory for such projects, and thus, it has been carried out by the promoter. The processes and their conclusions will be assessed at appraisal. Compliance with the EIB's environmental and social standards and amongst others, the principles of relevant EU Directives, will be verified at appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation and pollution prevention.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.
Statut
Approuvé - 28/07/2023
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).