Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220402
    Date de publication: 13 septembre 2022

    Promoteur – Intermédiaire Financier

    ACCEPTABLE CORPORATE(S)

    Lieu

    Description

    Global Authorisation enabling the Bank to efficiently finance energy access and energy efficiency projects for underserved populations, micro, small and medium-sized enterprises (MSMEs) and social infrastructure facilities.

    Objectifs

    The sub-projects to be financed under this Global Authorisation will provide access to modern and sustainable energy to currently underserved populations and enterprises. The operation thereby aims to improve energy access, enhance quality of life and economic opportunities for the beneficiaries, and to contribute to climate change mitigation by reducing the use of fossil fuel alternatives and unsustainable biomass. In addition there is a high likelihood to achieve significant gender equality contributions, however this needs to be assessed on sub-project level.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 160 million

    Aspects environnementaux

    The small size, multiple locations and nature of the installation of solar powered systems will limit the potential negative environmental impacts of the operation. The due diligence of each sub-operation will scrutinise the originator's capacity, approach and procedures for ensuring that the operation is implemented in line with the Bank's environmental and social standards.

    Passation des marchés

    The Bank will require the promoters of sub-projects to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Approuvé - 17/11/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Ensemble des Pays ACP Énergie