    Référence: 20220320
    Date de publication: 5 septembre 2022

    Promoteur – Intermédiaire Financier

    COMUNIDAD AUTONOMA DE MADRID

    Lieu

    Description

    The project concerns the Madrid City of Justice that will integrate in one single place all judicial bodies and services that are under the competences of the Autonomous Region of Madrid (Comunidad Autónoma de Madrid) and will constitute the largest single site dedicated to justice in Europe.

    Objectifs

    The main objective of the project is to improve the quality of the public service of the Administration of Justice, also pursuing the following objectives: -Centralise the judicial buildings in the same headquarters, solving the space deficit and the aging of some of the current buildings -Generate reserve spaces, in order to cater for future extensions of the judicial administration in Madrid -Improve the effectiveness and functioning of the judicial bodies, eliminating the reduction in the operability of the Administration of Justice derived from the dispersion of the judicial offices -Provide modern and functional infrastructures to the judicial bodies of Madrid, so legal officers can carry out their activities with the best possible quality parameters -Protect victims of crimes and the privacy of users, implementing spaces for specific attention and separation of circulations between detainees, officials and the public -Creation of fully accessible judicial infrastructure, without architectural barriers and with the implementation of the necessary measures to achieve universal accessibility in judicial buildings, which allows effective access to justice for all persons with disabilities, under equal conditions as the rest of the users of this essential public service -Optimise resources by reducing the costs associated with the lease of the buildings, the maintenance and upkeep of the facilities, as well as the costs associated with common services, through the configuration of a single project that enables the achievement of efficiency gains by managing all the lifecycle costs of a single infrastructure -Contribute to achieving the objectives of budgetary stability or financial sustainability, promoting in the long term a reduction in costs derived from the operational functioning of the service

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 250 million

    Coût total (montant approximatif)

    EUR 564 million

    Aspects environnementaux

    Compliance with the relevant EU Directives will be verified during appraisal stage: EIA Directive 2011/92/EU amended by the EIA Directive 2014/52/EU, SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the investments will be reviewed during project appraisal. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed. It is envisaged that the project will contribute to urban regeneration and sustainable urban development in the neighbourhood, generating significant positive social and economic benefits, including better living conditions thanks to increased services and public transport and job creation during implementation. All these elements will be evaluated during the appraisal of the project.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    À l'examen - 28/06/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Aménagement urbain Services