Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220226
    Date de publication: 8 mai 2024

    Promoteur – Intermédiaire Financier

    MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND

    Lieu

    Description

    The project concerns the construction of a new 56 km long S10 Expressway section between Bydgoszcz and Torun, in mid-northern Poland, in the Kuyavian-Pomeranian voivodeship (Kujawsko-Pomorskie) on a west-east road corridor between the Polish-German border near Szczecin and Warsaw.

    Objectifs

    The aim is to improve accessibility by adapting the technical and operational parameters of the road to the forecast traffic level and by removing bottlenecks on the existing links. The new S10 expressway will not only improve connectivity between the two cities but will also contribute to more efficient international and local traffic flow organization and driving conditions on the comprehensive Trans-European Networks (TEN-T) road corridor. The project is expected to contribute to improve traffic safety and living conditions for inhabitants alongside the existing National Roads.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 457 million

    Aspects environnementaux

    The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU and is therefore subject to an EIA procedure. Based on the conclusions from the EIA studies, in 2021 the Competent Authorities issued an Environmental Decision. Following the design stage, four second stage supplemental EIA (SEIA) studies, one for each works contract, were completed to apply for a construction permit (ZRID). The project alignment does not directly intersect any NATURA 2000 sites, except on a 100-meter section of the NATURA 2000 site Nieszawska Dolina Wisly, and runs near several others. The requirements of the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation. Potential climate risks, the scope and adequacy of the applied adaptation measures for ensuring long-term resilience of the new road, and impact of the project implementation on the GHG emissions will be further assessed during the appraisal. One of the project's objectives is to divert heavy traffic, thereby improving living conditions and safety in the local communities along national road DK10.

    Passation des marchés

    The project implementation has started with a design phase in 2022, works are expected to start in 2024 and the completion is planned by 2027. The promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Approuvé - 16/10/2024

    Milestone
    À l'examen
    Approuvé
    16 octobre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports