    200 000 000 €
    Pays
    Secteur(s)
    Pologne : 200 000 000 €
    Transports : 200 000 000 €
    Date(s) de signature
    26/11/2024 : 200 000 000 €

    Fiche récapitulative

    Date de publication
    8 mai 2024
    Statut
    Référence
    Signé | 26/11/2024
    20220226
    Nom du projet
    Promoteur – Intermédiaire financier
    S10 EXPRESSWAY BYDGOSZCZ - TORUN
    MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 200 million
    EUR 457 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project concerns the construction of a new 56 km long S10 Expressway section between Bydgoszcz and Torun, in mid-northern Poland, in the Kuyavian-Pomeranian voivodeship (Kujawsko-Pomorskie) on a west-east road corridor between the Polish-German border near Szczecin and Warsaw.

    The aim is to improve accessibility by adapting the technical and operational parameters of the road to the forecast traffic level and by removing bottlenecks on the existing links. The new S10 expressway will not only improve connectivity between the two cities but will also contribute to more efficient international and local traffic flow organization and driving conditions on the comprehensive Trans-European Networks (TEN-T) road corridor. The project is expected to contribute to improve traffic safety and living conditions for inhabitants alongside the existing National Roads.

    Additionnalité et impact

    The project concerns construction of a new 56 km long 2x2 lanes S10 expressway section between Bydgoszcz and Torun. The project contributes to improved efficiency of TEN-T road network in Poland, thereby improving accessibility and market integration. The project is expected to contribute to the reduction of safety related negative externalities, by diverting heavy and transit traffic from the agglomerations crossed by the national and local roads. The project will contribute to better accessibility in the region by adapting of the technical and operational parameters of the road to the forecast traffic level, removing bottlenecks and completing missing elements of the road infrastructure.

    The EIB impacts investment activity by providing financial support that is complementary to national financing.

    The terms of the EIB loan, notably in terms of long tenor (up to 30 years), appropriate disbursement conditions and advantageous financial terms will contribute substantially to increasing the financial flexibility and investment capacity of the Promoter, facilitating the completion of the Project on favourable terms and in a timely manner.

    Aspects environnementaux
    Passation des marchés

    The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU and is therefore subject to an EIA procedure. Based on the conclusions from the EIA studies, in 2021 the Competent Authorities issued an Environmental Decision. Following the design stage, four second stage supplemental EIA (SEIA) studies, one for each works contract, were completed to apply for a construction permit (ZRID). The project alignment does not directly intersect any NATURA 2000 sites, except on a 100-meter section of the NATURA 2000 site Nieszawska Dolina Wisly, and runs near several others. The requirements of the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation. Potential climate risks, the scope and adequacy of the applied adaptation measures for ensuring long-term resilience of the new road, and impact of the project implementation on the GHG emissions will be further assessed during the appraisal. One of the project's objectives is to divert heavy traffic, thereby improving living conditions and safety in the local communities along national road DK10.

    The project implementation has started with a design phase in 2022, works are expected to start in 2024 and the completion is planned by 2027. The promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    16 octobre 2024
    26 novembre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Évaluation des incidences environnementales et sociales - S10 EXPRESSWAY BYDGOSZCZ - TORUN - Raport oddziaływania na środowisko
    Date de publication
    14 Sep 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    216429303
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220226
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Fiche technique sur les aspects sociaux et environnementaux - S10 EXPRESSWAY BYDGOSZCZ - TORUN
    Date de publication
    24 Oct 2024
    Langue
    Sujet général
    Prêts
    Numéro du document
    204234434
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220226
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes