Référence: 20210765
Date de publication: 26 juin 2023

Promoteur – Intermédiaire Financier

STATE OF ISRAEL - MINISTRY OF FINANCE

Lieu

Description

The project will finance the design, construction and operation of a sea-water desalination facility, with production capabilities of 100 million m3 per annum to be located in Western Galilee, Israel.

Additionality and Impact

The project concerns the construction of a seawater reverse osmosis desalination plant under a Build Operate and Transfer contract in Israel. The project is a high priority water supply infrastructure aimed at ensuring access to water in one of the world's most water stressed region. The project will contribute to meeting the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability. The project will address a number of market failures through positive externalities notably from public health benefits, the protection and replenishment of over drafted groundwaters and an increased resilience to extreme weather events. By providing sustainable and reliable access to water in Israel, the project is aligned with the Strategic Priorities of the European Neighbourhood Instrument (ENI) and the latest EU/Israel Action Plan, which aim, among others, at promoting cooperation between Israel and the EU in reducing water pollution, protecting water resources and increasing the re-use of water.


In terms of financial contribution, the EIB is expected to offer attractive and customised financing terms, which will increase the sustainability and ultimately lower the water desalination cost. The EIB loan contributes to the diversification of borrower's funding in terms of maturity profile, financier base as well as to the optimisation of the capital structure.

Objectifs

The project iaims to ensure access to water, with significant climate change adaptation and mitigation impact, to address persistent droughts and increased demand for water in the country.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 470 million

Aspects environnementaux

A combined environmental impact assessment for the proposed Western Galilee desalination plant has already been carried out by the promoter. The EIB shall ensure that it complies with the EIB's Environmental and Social standards and safeguards.

Passation des marchés

The project is procured under a public-private partnership (PPP) contract that includes a concession to build and maintain the facility for 25 years. The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The borrower of the proposed EIB loan is the PPP winning bidder.

Statut

Signé - 23/12/2023

Milestone
À l'examen
Approuvé
Signé
15 juin 2022
23 décembre 2023

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Israël Eau, assainissement