    Référence: 20210059
    Date de publication: 26 mai 2021

    Promoteur – Intermédiaire Financier

    TENNET HOLDING BV

    Lieu

    Description

    The project comprises the construction of a c. 41-km long electricity transmission corridor from Eemshaven to Vierverlaten, in the north of the Netherlands. It includes a new 380kV line from Eemshaven to Vierverlaten, combined with a 110kV line for part of the route, and a new 380/220kV substation in Vierverlaten.

    Additionality and Impact

    The project comprises the construction of a 41km-long electricity transmission corridor from Vierverlaten to Eemshaven, in the Netherlands. It will increase the capacity of the Dutch electricity transmission system, ensure compliance with the Dutch Grid Code for this part of the network and support the integration of cross-border connection into the Dutch grid. It is fully consistent with and supports national and EU policies on energy and climate. It helps addressing the market failure caused by negative environmental externalities, by enabling the future integration of renewable generation, while also contributing to the provision of a public good (security and reliability of supply), by enhancing a critical infrastructure for decarbonisation.
    The project's results are deemed good in terms of economic welfare by virtue of the benefits it generates, as well as from the environmental, social, and governance viewpoints.
    The financing of the EIB is functional to enabling the ambitious CAPEX plan that the Promoter foresees as fundamental for the transition to a decarbonised economy. The EIB contribution materialises in terms of diversification of sources of funds, attractive financing conditions, and signalling to markets.

    Objectifs

    The overall purpose of the project is to increase the Netherland's electricity transmission capacity and to enable the evacuation of power from offshore wind farms.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 250 million

    Coût total (montant approximatif)

    EUR 527 million

    Aspects environnementaux

    The potential environmental impacts of the project include visual impact, vegetation clearance, electromagnetic fields, noise nuisance, and birds' collision and electrocution. The project falls under Annex I of the EIA directive, thus requiring an environmental impact assessment (EIA). The Environmental Impact Studies (EISs) have been prepared and the relevant approvals have been issued by the competent authorities. The EIS(s) and the planned mitigation measures will be reviewed during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU where applicable), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 16/09/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays-Bas Énergie