Référence: 20210026
Date de publication: 3 novembre 2021

Promoteur – Intermédiaire Financier

TAURON POLSKA ENERGIA SA

Lieu

Description

The programme concerns investment schemes in the electricity distribution network in South and South-Western Poland over the period 2022-2026. The programme includes network reinforcements and refurbishments in high and medium-voltage networks and the connection of new customers in medium and low-voltage networks. The programme also includes components for the digitalisation and automation of the network.

Additionality and Impact

The program comprises the reinforcement and modernisation of the electricity distribution network in Poland, consistently with the country's National Energy and Climate Plan and in alignment with EIB public policy goals.


The programme schemes are located in seven regions in the country, all comprising Cohesion Priority Regions. The programme helps addressing market failures linked to negative climate and environmental externalities (by enabling the future integration of renewable generation, while also contributing to the electrification of the economy) as well as improving security of supply, a public good.


The project's results are deemed good in terms of economic welfare by virtue of the benefits it generates, as well as from a governance perspective.


The financial value added provided by the EIB loan is very much appreciated by the Promoter. The availability of attractively priced, PLN-denominated funding with similar long maturities is not available on the Polish bank and bond market. The long tenor of the EIB loan (18) is well in line with the economic life of the underlying asset (25 years) and the expected cash flow of the investment. 

Objectifs

The programme will allow the Promoter to connect new users, including renewable generation, as well as to maintain or improve the reliability and quality standards of electricity supply.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

PLN 2800 million (EUR 615 million)

Coût total (montant approximatif)

PLN 4003 million (EUR 880 million)

Aspects environnementaux

Some Programme schemes may fall under Annex II of Directive 2014/52/EU, amending the EIA Directive 2011/92/EU thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental and biodiversity impact and appropriate assessments.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for implementation of the project have been and shall be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 29/10/2021

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Énergie