Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200566
    Date de publication: 8 octobre 2020

    Promoteur – Intermédiaire Financier

    PWN WATERLEIDINGBEDRIJF NOORD-HOLLAND NV

    Lieu

    Description

    The project concerns the 2021-2025 investment programme into the production and distribution facilities of PWN, the fourth-largest water supply company in the Netherlands.

    Objectifs

    The project will secure or enhance the quality of life of around 1.7 million residents in the region north-west of Amsterdam by improving the reliability and affordability of the water supply service. The project will ensure continued compliance with the Water Framework Directive (2000/60/EC), the Drinking Water Directive (98/83/EC) and national norms.

    Commentaires

    None.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 282 million

    Aspects environnementaux

    The investment programme is geared toward securing a sustainable management of water supply and distribution, bringing about a positive social and environmental impact. The upgrade of water treatment plants and transportation pipelines are examples of components with environmental/resource efficiency impacts. Compliance with EU and national environmental legislation will be verified during appraisal.

    Passation des marchés

    The Bank will require that the Promoter ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 9/12/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays-Bas Eau, assainissement