Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200545
Date de publication: 12 mars 2025

Promoteur – Intermédiaire Financier

EUROPEAN BORDER AND COAST GUARD AGENCY

Lieu

Description

The project will finance the design and construction of the new headquarters in Warsaw for the European Border and Coast Guard Agency (FRONTEX). The new permanent headquarters will serve as their central hub, functioning as an operational centre for monitoring and surveillance of European borders, as well as an information centre for processing, assessing, and analysing border data from European Member States and Schengen-associated countries.

Objectifs

The project involves the development of the new permanent headquarters for Frontex in Warsaw, Poland. The development land for the new headquarters is located at 132 Raclawicka Street, in the Mazovian Voivodeship and is a 2.93 hectare brownfield site that was transferred from the Polish Government to Frontex. The aim of Frontex is to design and construct at its own costs the new headquarters. The project is estimated to encompass up to 70,000 square meters and will accommodate up to 2,000 employees.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 237 million

Coût total (montant approximatif)

EUR 316 million

Aspects environnementaux

The requirements of the applicable environmental legislation, mainly: EIA Directive 2011/92/EU amended by the EIA Directive 2014/52/EU, SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC, will be verified during appraisal stage. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed. It is envisaged that the Project will contribute to urban regeneration and sustainable urban development in local neighbourhoods, generating significant positive social and economic benefits, including job creation during implementation and operation. The Project is expected to contribute to climate action and environmental sustainability objectives, in particular to climate mitigation.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for implementation of the Project will be tendered in accordance with the procurement legislation applicable to Frontex, Regulation (EU, Euratom) 2018/1046 on the financial rules applicable to the general budget of the Union (Financial Regulation), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

À l'examen - 17/05/2021

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Aménagement urbain