Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200476
    Date de publication: 16 novembre 2020

    Promoteur – Intermédiaire Financier

    MINISTERE DU CADRE DE VIE ET DU DEVELOPPEMENT DURABLE - REPUBLIQUE DU BENIN

    Lieu

    Description

    Rainwater drainage project for eight secondary cities in Benin (Porto-Novo, Abomey-Calavi, Bohicon, Natitingou, Abomey, Ouidah, Sèmè-Podji, Parakou).

    Objectifs

    The project will consist of the extension and rehabilitation of the primary and secondary rainwater drainage systems, as well as of the rehabilitation of the related roads of the concerned cities. The EIB will finance the works for two of the eight cities concerned, Abomey Calavi and Sèmè-Podji. The project will significantly decrease flooding, as well as stagnating water, with a positive impact on human and economic development. It will contribute considerably to improving the living conditions of the population, and to mitigating the effects of climate change. As most of the cities concerned, including Abomey Calavi and Sèmè-Podji, are on the coast or near the coast, the project will also contribute to reducing the amount of plastic waste reaching the Atlantic Ocean.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 125 million

    Coût total (montant approximatif)

    EUR 424 million

    Aspects environnementaux

    The project's compliance with the applicable national environmental legislation and the EIB's environmental and social principles will be respected, as will the Promoter's procedures for impact assessment and environmental monitoring.

    Passation des marchés

    Implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 24/03/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bénin Eau, assainissement