    Référence: 20200432
    Date de publication: 5 octobre 2020

    Promoteur – Intermédiaire Financier

    CEPS AS

    Lieu

    Description

    Multi-component investment programme covering the period 2020-2024 aimed at reinforcing the electricity transmission infrastructure of the Czech Republic.

    Objectifs

    The project is expected to enable the Promoter to improve the safety of the system, support the efficient operation of the electricity market in central and eastern Europe and maintain the reliability and quality of the electricity supply.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    CZK 5000 million (EUR 189 million)

    Coût total (montant approximatif)

    CZK 11303 million (EUR 428 million)

    Aspects environnementaux

    The project concerns electricity transmission schemes (overhead lines, new substations and works in existing facilities) some of which will fall under Annex I of the Environmental Impact Assessment (EIA) Directive and will have to undergo an obligatory environmental impact assessment, while most of the remainder will fall under Annex II, which requires the competent national authority to determine the need for an EIA. The main impacts that can typically be expected for a project of this nature relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction.

    Passation des marchés

    The Bank will require that the Promoter ensure that contracts for the implementation of the Programme schemes have been tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 19/11/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).