Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200158
    Date de publication: 15 octobre 2020

    Promoteur – Intermédiaire Financier

    CESKE DRAHY AS

    Lieu

    Description

    Retrofit of around 95 pieces of rolling stock with European Train Control System (ETCS) on-board units, including eight prototypes.

    Objectifs

    By means of contributing to achieving interoperability of the EU railway system, the project is expected to improve the competitiveness of rail vis à vis other modes of transport, thereby promoting sustainable transport solutions in line with EU objectives and present environmental and safety benefits due to preventing modal shift from rail to road. Furthermore, the rolling stock will provide services predominantly in a Convergence Region, and thereby facilitate regional development.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    CZK 904 million (EUR 34 million)

    Coût total (montant approximatif)

    CZK 2203 million (EUR 83 million)

    Aspects environnementaux

    The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU as manufacturing and use of rail rolling stock is not included in either list. The need for an environmental impact assessment (EIA) and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 1/08/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    République tchèque Transports