    Référence: 20200122
    Date de publication: 16 juin 2020

    Promoteur – Intermédiaire Financier

    INDEPENDENT POWER TRANSMISSION OPERATOR SA

    Lieu

    Description

    The project will finance the electricity interconnection between the island of Crete and Attica, the region of the Greek capital, Athens. The project includes the implementation of a bipolar High Voltage Direct Current (HVDC) link with a rated capacity of 1000 MW, rated voltage /±500 kV and a submarine cable of length of 328 km. The implementation of several other transmission system assets for the connection of the HVDC link with the existing network is also part of the project.

    Objectifs

    The project (a) will enable the replacement of thermal generation on the island of Crete (mainly oil-fired generation units) with more efficient generation from mainland Greece and (b) will increase the hosting capacity of the island for Renewable Energy Sources (RES). Considering the above, the project is expected to have a positive contribution to Climate Action.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 300 million

    Coût total (montant approximatif)

    EUR 1074 million

    Aspects environnementaux

    Some of the investments may fall under Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for an Environmental Impact Assessment. The status of permitting and the need for the project to undergo an EIA and/or Appropriate Assessment are not known at this stage and will be further investigated during appraisal. The actual impacts, including potential negative impacts on sites of Natura conservation importance, and the planned mitigating and/or compensating measures will be reviewed during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU and 2004/17/EC, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Tender notices already published in the EU Official Journal are: 2019/S 092-223460 and 2019/S 092-223461.

    Statut

    Signé - 23/12/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Énergie