Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200001
    Date de publication: 16 janvier 2023

    Promoteur – Intermédiaire Financier

    ZELJEZNICKA INFRASTRUKTURA CRNE GORE AD

    Lieu

    Description

    The project concerns the railway reconstruction along the Vrbnica - Podgorica - Bar railway line forming a part of the Orient/East Mediterranean TEN-T Core Network corridor, indicative extension to the Western Balkans.

    Objectifs

    The project concerns rehabilitation works across southern, central and northern Montenegro along the Bar - Podgorica - Vrbnica railway line forming part of the indicative Extended Orient/East Mediterranean TEN-T core corridor (SEETO Route 4). The project is expected to include the following four components to be confirmed during appraisal: - Rehabilitation of the permanent way on 20 km of single track line in central Montenegro; - Rehabilitation of 13 steel bridges at various locations across the country; - Rehabilitation of 8 tunnels at various locations across the country; - Modernization of 3 workshops for rolling stock in Bar, Podgorica and Niksic;

    Secteur(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 76 million

    Coût total (montant approximatif)

    EUR 80 million

    Aspects environnementaux

    If situated within the EU, all the project components would fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended by Directive 2014/52/EU, and would therefore be subject to screening. Screening out decisions for the tunnels and bridges have already been issued by the Competent Authority, and similar decisions are expected for the remaining two components. The overall compliance of the project to EIB standards, and the safeguard management arrangements, will be verified during appraisal.

    Passation des marchés

    The EIB will require the promoter to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Approuvé - 21/12/2022

    Milestone
    À l'examen
    Approuvé
    21 décembre 2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Monténégro Transports