    Référence: 20190810
    Date de publication: 20 octobre 2022

    Promoteur – Intermédiaire Financier

    MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIRE

    Lieu

    Description

    The project aims at upgrading the RN13 road section between Sfax and Kasserine (180 km) from 2x1 to 2x2 lanes, including median barriers. This road is leading to the Algerian border, about 50 km further east.

    Objectifs

    The project is in line with the general policy of the country and has been selected as a national priority of the National Transport Master Plan 2040 and was considered for the Action Plan for the Period 2020 to 2030.

    Commentaires

    The signature is expected to occur in the first half of 2023.

    Secteur(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 210 million

    Coût total (montant approximatif)

    EUR 424 million

    Aspects environnementaux

    The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures. Public consultation at feasibility studies and preliminary design stages were carried out for most of the project scope. They are being updated for the final technical description and will be reviewed. Stakeholder engagement arrangements and particularly grievance mechanism for project implementation will also be assessed.  The preliminary Climate Risk Assessment shows risks of flooding in various project sections, notably in the vicinity of main cities and rivers. The preliminary design considers 50 to 100-year return periods for drainage systems depending on risk and size. Detailed design will assess if more climate adaptation measures are required.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 13/06/2024

    Milestone
    À l'examen
    Approuvé
    Signé
    8 décembre 2022
    13 juin 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).