Recherche Fr menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20190810
Date de publication: 20 octobre 2022

Promoteur – Intermédiaire Financier

MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIRE

Lieu

Description

The project aims at upgrading the RN13 road section between Sfax and Kasserine (180 km) from 2x1 to 2x2 lanes, including median barriers. This road is leading to the Algerian border, about 50 km further east.

Objectifs

The project is in line with the general policy of the country and has been selected as a national priority of the National Transport Master Plan 2040 and was considered for the Action Plan for the Period 2020 to 2030.

Commentaires

The signature is expected to occur in the first half of 2023.

Secteur(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 210 million

Coût total (montant approximatif)

EUR 424 million

Aspects environnementaux

The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures. Public consultation at feasibility studies and preliminary design stages were carried out for most of the project scope. They are being updated for the final technical description and will be reviewed. Stakeholder engagement arrangements and particularly grievance mechanism for project implementation will also be assessed.  The preliminary Climate Risk Assessment shows risks of flooding in various project sections, notably in the vicinity of main cities and rivers. The preliminary design considers 50 to 100-year return periods for drainage systems depending on risk and size. Detailed design will assess if more climate adaptation measures are required.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

Signé - 13/06/2024

Milestone
À l'examen
Approuvé
Signé
8 décembre 2022
13 juin 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Tunisie Transports