Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190761
    Date de publication: 13 mars 2020

    Promoteur – Intermédiaire Financier

    NKM ARAMHALOZATI KFT

    Lieu

    Description

    The project consists of an investment programme including schemes for the reinforcement and modernisation of the electricity distribution network in South-East Hungary.

    Objectifs

    The programme encompasses several high, medium and low voltage electricity distribution schemes, including the deployment of smart meters and components for network automation. This will enable the promoter to maintain high quality of services and low losses across its electricity distribution network.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 120 million

    Coût total (montant approximatif)

    EUR 160 million

    Aspects environnementaux

    The project includes schemes that fall under Annex II of Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU, thus requiring a review by the competent authorities at the permitting stage, with regards to the necessity for environmental and biodiversity assessments. The impacts that can typically be expected from some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbance during construction.

    Passation des marchés

    The promoter has to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation.

    Statut

    Signé - 29/09/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Hongrie Énergie