Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190669
    Date de publication: 30 mars 2020

    Promoteur – Intermédiaire Financier

    LARIO RETI HOLDING SPA

    Lieu

    Description

    The project concerns investments in water and wastewater infrastructure in the Province of Lecco (Lombardy Region) during the period 2019 - 2023.

    Objectifs

    The purpose of the planned investments is to: (i) increase the efficiency and reliability of the water systems (ii) enhance the performance of wastewater collection and treatment services to ensure compliance with regional environmental requirements. Some components will also contribute to closing the infringement procedure opened against Italy for failing to comply with the requirements of Urban Wastewater Treatment Directive 91/271/EEC.

    Commentaires

    n/a

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 113 million

    Aspects environnementaux

    The project is expected to have positive net environmental and social impact, considering the focus on compliance. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.

    Statut

    Signé - 29/07/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Eau, assainissement