Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190589
    Date de publication: 2 janvier 2023

    Promoteur – Intermédiaire Financier

    COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE - SA

    Lieu

    Description

    The project concerns the construction of a new 51.8 km 2x2 lanes motorway section of the A3 motorway between the towns of Targu Mures, Ogra and Campia Turzii and a 4.7 km national 2x2 link road to the city of Targu Mures.

    Additionality and Impact

    The Project is located on the Core TEN-T Network in a Cohesion region of Romania. The Project addresses the market/network failures related to accessibility along the Core TEN-T Network.

    The new link will reduce travel times, vehicle operating costs, accident levels and exposure of inhabitants to air and noise pollutants and improve the quality of life for local residents along the existing DN15 (E60).

    The Project will serve local, regional and international traffic demand. The project has benefited from JASPERS and PASU Technical Assistance to the Managing Authority.

    Romania will benefit from the advantageous financial conditions offered by EIB, including long tenors (up to 25 years) and attractive interest rates. Such conditions will allow Romania for a considerable financial flexibility in the implementation of its transport infrastructural investments (including the T Mures-Ogra-C Turzii A3 highway) and contribute to the effective absorption of EU funds.

    Objectifs

    The aim is to improve mobility on the trans-European network (TEN-T) core road infrastructure, reduce travel times, vehicle operating costs and accident levels. The project will also improve the quality of life for local residents along the existing DN15 (E60), by reducing their exposure to air and noise pollutants.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 33 million

    Coût total (montant approximatif)

    EUR 529 million

    Aspects environnementaux

    The EU and Romania national legal procedures have been properly followed in the project preparation and implementation. EIA study has been completed and the competent authorities have issued environmental decisions and building permits.

    Passation des marchés

    The Promoter is a public contracting authority subject to the relevant EU directives. The procurement is following the principles of the Directives 2014/24/EC and 89/665/EC. The project works and service contracts have been procured through open tenders after international publication in the OJEU.

    Statut

    Approuvé - 8/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Transports