Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190378
    Date de publication: 26 mars 2020

    Promoteur – Intermédiaire Financier

    LG CHEM WROCLAW ENERGY SP ZOO

    Lieu

    Description

    The project will finance the design, construction, commissioning and operation of an innovative large-scale integrated lithium-ion battery cells-to-packs manufacturing facility for the supply of European automotive manufacturers with advanced 3rd generation li-ion batteries for electric vehicles.

    Objectifs

    The objective is to offer Europe the prospect of a cost-competitive Li-ion battery cells supply basis, enhancing independence from imports. The project will seek to be competitive through a vertical integrated production process, high degree of automatisation and digitalisation, and a maximum of components and materials sourced in Europe.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 480 million

    Coût total (montant approximatif)

    EUR 1514 million

    Aspects environnementaux

    The project concerns capital investments for the production of lithium-ion electrodes, cells and batteries, falling under the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. All environmental, health and safety issues including environmental and operational authorisations will be reviewed during the due diligence process.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation 2014/25/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 6/03/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Industrie