Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190324
    Date de publication: 21 octobre 2019

    Promoteur – Intermédiaire Financier

    LAO PEOPLE'S DEMOCRATIC REPUBLIC

    Lieu

    Description

    The proposed framework loan is expected to finance road rehabilitation works in Laos to maintain and improve connectivity and accessibility and to improve their climate resilience. The project will include road sections that require urgent rehabilitation as their current condition hampers economic development and access to public services.

    Objectifs

    The proposed framework loan is expected to finance road rehabilitation works in Laos to maintain and improve connectivity and accessibility and to improve their climate resilience. The project will include road sections that require urgent rehabilitation as their current condition hampers economic development and access to public services.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 398 million

    Aspects environnementaux

    An Environmental and Social Management Framework is being prepared for the NR13 and it will be assessed to what extent this framework can apply for all schemes under the proposed framework loan. Gender issues will also be considered, to ensure that the road designs take into account the needs of various user groups. The projects under this framework loan will also improve the climate resilience of the roads and thus contribute to Climate Action.

    Passation des marchés

    It will be required that the promoter ensures that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

    Statut

    Signé - 20/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Laos Transports