Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20190298
Date de publication: 18 décembre 2019

Promoteur – Intermédiaire Financier

KANTELEEN VOIMA OY

Lieu

Description

The project will finance (i) the upgrade of the condensing power plant to a Combined heat and power (CHP) plant (ii) a greenfield advanced bioethanol plant (iii) a greenfield biogas plant and (iv) ancillary equipment.

Objectifs

The CHP plant aims at co-combusting fossil and renewable feedstocks during a transition period. The fossil feedstock shall be progressively phased out. The whole project is in line with the principles and goals of the Renewable Energy Directive (RED) II 2018/2001/EU, supporting the production of advanced biofuels from forest residues and sawmill by-products (RED, Annex IX, part A).

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 95 million

Coût total (montant approximatif)

EUR 316 million

Aspects environnementaux

Compliance with the environmental legislation (notably the Environmental Impact Assessemnt (EIA) directive 2014/52/EU amending the EIA Directive 2011/92/EU) will be assessed during appraisal, as well as well compliance with the Industrial Emissions Directive (IED) directive 2010/75/EU.  The EIA for the new complex (bioethanol & biogas production) was performed in 2017. The environmental permit approval should be received in early 2020.  Concerning the upgrade of the power plant from electricity only to a CHP, the EIB will ensure that the project is aligned with the EIB new threshold for GHG emissions, as well as with the RED 2018/2001/EU.

Passation des marchés

Based on the information provided, the promoter has been identified as a privately owned entity operating in the utility sector, that has not been granted special or exclusive rights and does not operate in markets which are not liberalised. The procurement regime will be assessed during appraisal.

Statut

À l'examen - 11/11/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Finlande Énergie