    Référence: 20180862
    Date de publication: 20 mai 2019

    Promoteur – Intermédiaire Financier

    GASUNIE TRANSPORT SERVICES BV,NEDERLANDSE GASUNIE NV

    Lieu

    Description

    The project entails the construction of a nitrogen plant in Zuidbroek in the Netherlands, to regulate the calorific value of the natural gas supplied by the promoter's network.

    Objectifs

    This plant will produce nitrogen, which will be compressed then blended with imported High Calorific Value gas (H-gas) and then injected as Low Calorific Value gas (L-gas) into the Dutch gas network, thus replicating the gas technical specifications used in the Netherlands and surrounding regions/countries and allowing for the reduction of supplies from the Groningen field. The main project components consists of air separation units to extract the nitrogen, compressing and cooling units, as well as of mixing stations.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 240 million

    Coût total (montant approximatif)

    EUR 502 million

    Aspects environnementaux

    Tthe main potential impacts on the environment during construction concern the disturbance to communities, in particular the expected increase in traffic volume, as construction will take place concomitantly with the installation of a solar park and wind farms nearby. The technology to be used for the air separation units, which is the best technology available to produce nitrogen at high degree of purity level and in large quantities, is a cryogenic nitrogen production plant. This type of installation operates at very low temperatures and requires a large amount of energy/electricity. The project's carbon footprint will be assessed at the appraisal. The project does not fall under Annex I nor Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending the EIA Directive 2011/92/EU). The promoter has also informed that the project is not located inside or in the vicinity of any Natura 2000 sites, and shall not have any impact on Natura 2000 sites as defined by the Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively). At the appraisal the Bank will also request the competent authorities' confirmation that the project does not to have any significant impact on sites of nature conservation. During the appraisal, the Bank will further assess the environmental risksaspects of the Project and confirm its alignment with applicable EU environmental policy and regulation. This includes review of environmental permitting documentation and related environmental management measures.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, where applicable as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 3/03/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).