Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180781
    Date de publication: 16 octobre 2019

    Promoteur – Intermédiaire Financier

    KCM AD

    Lieu

    Description

    The project includes investments in a new lead refining plant and zinc electrolysis unit both replacing outdated units, and the upgrade of the zinc recycling unit resulting in lower production costs, better environmental performance, increased recycling rates of lead and zinc containing waste, and better working conditions.

    Objectifs

    This project aims at decoupling growth from use of resources and emissions (including greenhouse gases emissions) by: - an increased processing capacity, with a focus to increase treatment of waste streams containing zinc/lead and increase eco-effectiveness of finite precious metals in the region; - an increase the circularity of metals; - a decrease in production costs by improving resource efficiency, raw materials flexibility and shift from heavy fuel to natural gas; - a reduction of the environmental impact of its production to comply with future/more stringent regulations and ensure better working conditions for its production staff, and - a reduced reliance on concentrates from the mining sector, and related risk, e.g. price fluctuations and supply disruptions.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 65 million

    Coût total (montant approximatif)

    EUR 130 million

    Aspects environnementaux

    The implementation of the promoter's technological modernisation and upgrading program has and will continue to improve the environmental performance of the production, and enable to run its facilities in compliance with European legislation, and even move beyond what is legally required, e.g. with regards to compliance with the relevant Best Available Technique (BAT), recycling targets, and environmental management plan.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. Procurement procedures followed for the selection of the potential suppliers of services and equipment will consist of negotiated procedures without publication in the Official Journal of the European Union. Under these conditions, the procurement procedures to be followed by the promoter are suitable for the project and satisfactory to the EIB.

    Statut

    Signé - 11/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bulgarie Industrie