Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180709
    Date de publication: 26 octobre 2020

    Promoteur – Intermédiaire Financier

    ENERGIJOS SKIRSTYMO OPERATORIUS AB

    Lieu

    Description

    The project concerns the installation of approximately 1.2 million electricity smart meters in Lithuania in the period 2020-2023 to replace the existing electromechanical meters; this corresponds to approximately 66% of all the installed meters in the country at present. The project includes the related IT infrastructure as well as the development of a data hub (i.e. a data exchange platform for the electricity market participants).

    Objectifs

    The new metering system will allow for remote readings, near real-time consumption information and communication with consumer devices. The deployment of smart meters is expected to lead to operational savings for the Promoter, energy savings for the consumers and increased energy market efficiency. The deployment of smart meters is part of the revised National Energy Independence Strategy as adopted in Lithuania in June 2018.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 110 million

    Coût total (montant approximatif)

    EUR 147 million

    Aspects environnementaux

    No significant environmental impacts are expected. The Bank will evaluate the environmental aspects of the project and will review the relevant Promoter's procedures applied to implement the project to ensure that they are in line with EU standards and good industry practice.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the Programme schemes have been tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 23/09/2020

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Lituanie Énergie