Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20180709
Date de publication: 26 octobre 2020

Promoteur – Intermédiaire Financier

ENERGIJOS SKIRSTYMO OPERATORIUS AB

Lieu

Description

The project concerns the installation of approximately 1.2 million electricity smart meters in Lithuania in the period 2020-2023 to replace the existing electromechanical meters; this corresponds to approximately 66% of all the installed meters in the country at present. The project includes the related IT infrastructure as well as the development of a data hub (i.e. a data exchange platform for the electricity market participants).

Objectifs

The new metering system will allow for remote readings, near real-time consumption information and communication with consumer devices. The deployment of smart meters is expected to lead to operational savings for the Promoter, energy savings for the consumers and increased energy market efficiency. The deployment of smart meters is part of the revised National Energy Independence Strategy as adopted in Lithuania in June 2018.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 110 million

Coût total (montant approximatif)

EUR 98 million

Aspects environnementaux

No significant environmental impacts are expected. The Bank will evaluate the environmental aspects of the project and will review the relevant Promoter's procedures applied to implement the project to ensure that they are in line with EU standards and good industry practice.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the Programme schemes have been tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

Statut

Signé - 23/09/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Lituanie Énergie