Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180704
    Date de publication: 6 mars 2019

    Promoteur – Intermédiaire Financier

    IS CALEA FERATA DIN MOLDOVA

    Lieu

    Description

    The project consist of the rehabilitation of the infrastructure of around 233 km of a single track railway line in Moldova between Bender, Basarabeasca, Etulia and Giurgiulesti.

    Objectifs

    The project will restore the original design performance of the line, in particular remove the speed limitations due to the poor conditions of the track. The project will also improve the quality, safety, reliability and availability of the infrastructure, necessary to maintain the existing level of traffic. In addition, the project will increase capacity and generate a potential increase in traffic flows.

    Commentaires

    This operation is covered by the EU comprehensive guarantee for EIB loans outside the EU.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 54 million

    Coût total (montant approximatif)

    EUR 120 million

    Aspects environnementaux

    If implemented within the EU, the project would fall either out of the scope of the Environmental Impact Assessment (EIA) Directive or under Annex II of the EIA Directive. The competent authority (the Ministry of Agriculture, Regional Development and Environment) analysed the project and has decided that no EIA is required. The criteria used by the competent authority, as any potential impact on protected sites will be analysed at the appraisal. Overall, the project is expected to contribute to a higher modal share of rail over road transport. By promoting sustainable means of transport, the project is expected to present environmental benefits including contributing to climate change mitigation.

    Passation des marchés

    The promoter will be required to implement the project in accordance with the European Bank for Reconstruction and Development (EBRD) procurement rules and procedures, and in compliance with the requirements and standards agreed between the EBRD and the EIB for projects under the Procedural Framework for operations outside the EU, as foreseen in the Bank's Guide to Procurement. In particular, the Bank will require that calls for international tenders be published in the Official Journal of the European Union (OJEU) in accordance with the Bank's Guide to Procurement.

    Statut

    Approuvé - 16/07/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Rep. De Moldova Transports