    Référence: 20180644
    Date de publication: 3 février 2020

    Promoteur – Intermédiaire Financier

    IPI GROUP (HOLDING) SAL

    Lieu

    Description

    The project will finance a new energy efficient infrastructure (cooling system, electrical supply, PV) for the existing and new cellular towers across Lebanon, to improve the energy efficiency and reliability of power supply, as well as increasing renewable energy consumption.

    Objectifs

    The main objective is to foster economic resilience in Lebanon, by improving the energy efficiency and providing a reliable and sustainable source of power to telecom infrastructures. As the country experiences very frequent electricity outage, this is critical to ensure continuous service of the mobile networks. Another objective is to contribute to climate change mitigation by increasing electricity generation capacity from renewable sources.

    Commentaires

    The project is in line with the EIB's External Lending Mandate 2014 - 2020 and the Economic Resilience Initiative.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    USD 30 million (EUR 27 million)

    Coût total (montant approximatif)

    USD 54 million (EUR 48 million)

    Aspects environnementaux

    The project will bring global environmental benefits, through energy savings and CO2 emissions reduction. It will also reduce local pollution, by reducing the running hours of small and very polluting diesel generators.

    Passation des marchés

    The promoter will have to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the EIB Guide to Procurement.

    Statut

    Signé - 27/09/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Liban Énergie