Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180605
    Date de publication: 3 avril 2019

    Promoteur – Intermédiaire Financier

    BRENMILLER ENERGY LTD

    Lieu

    Description

    The project consists of the financing of a production plant for the commercial roll-out of innovative, cost-competitive large-scale, long-duration thermal energy storage units suitable for different market applications and segments.

    Objectifs

    The aim of the operation is to co-finance under the InnovFin Energy Demonstration Projects ("EDP") the design, construction and operation of a manufacturing plant to produce and commercialise innovative thermal storage systems across Europe, North America and Africa. The Company plans the rollout of efficient and flexible clean energy storage modules. Its final purpose is to allow the stabilisation of the renewable energy production by adding flexibility to existing plants, eliminating the need for polluting back up conventional plants and lowering electricity prices and emissions.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 8 million

    Coût total (montant approximatif)

    EUR 18 million

    Aspects environnementaux

    The project research, development and innovation (RDI) activities are expected to be carried out in existing facilities, which are already authorised facilities that will not change their already-authorised scope due to the project. An Environmental Impact Assessment (EIA) will therefore not be needed for the RDI stage as per Directive 2014/52/EU amending the EIA Directive 2011/92/EU. It could, however, be that the implementation and expansion of both demonstration manufacturing plants may require an EIA at the locations of project implementation. The Bank's services will put as a condition precedent for the final disbursements that the provider has to inform the Bank whether an EIA is necessary or and if yes, require that a positive EIA is a condition precedent for such disbursements.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement. However, the promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

    Statut

    Signé - 31/03/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Israël Industrie