Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180250
    Date de publication: 12 juin 2018

    Promoteur – Intermédiaire Financier

    CARUNA NETWORKS OY

    Lieu

    Description

    The project consists of a multi-component investment programme in the electricity distribution network in the South West and the North of Finland in the 2018-2019 period. The programme includes network reinforcements and refurbishments in high, medium and low voltage networks as well as the replacement of overhead lines with underground cables motivated by climate adaptation reasons.

    Objectifs

    The project will allow the promoter to connect new users including renewable generation as well as to maintain and improve the reliability and quality standards of electricity supply.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 445 million

    Aspects environnementaux

    Some of the project schemes may fall under Annex II of Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for environmental and biodiversity assessments. The promoter's capacity and procedures to ensure compliance with environmental and biodiversity regulations will be reviewed during the appraisal as well as the possibility of impacts on sites of nature conservation.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the schemes have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 11/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Finlande Énergie