Recherche Fr menu Banque européenne d’investissement - Logo ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180104
    Date de publication: 26 octobre 2018

    Promoteur – Intermédiaire Financier

    ENEL GREEN POWER ESPANA SL

    Lieu

    Description

    The project consists of the implementation of wind power renewable energy generation projects (490MW) and solar photovoltaic generation projects (342MW) awarded to the company in the recent Spanish auction, to be constructed in the 2018-2019 period.

    Objectifs

    The present operation will contribute to the achievement of Spanish 2020 targets for renewable energy and to the reduction of the Carbon dioxide (CO2) emissions.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 335 million

    Coût total (montant approximatif)

    EUR 703 million

    Aspects environnementaux

    Both wind and solar plants fall within the Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), and have been screened in, requiring a full EIA including public consultation, while one wind farm, with capacity of 8 MW has been screened out, but has anyway undergone environmental impact studies (one as old as 2008 and another one to be completed by September 2018) provided with an environmental study. The permitting and land acquisition processes are ongoing for most plants. Detailed assessment of environmental and social issues, as well as of compliance with the Bank Environmental and Social standards, will be performed at the appraisal.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions . However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 21/12/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Espagne Énergie