Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170985
    Date de publication: 24 mai 2018

    Promoteur – Intermédiaire Financier

    DRUZBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI DD

    Lieu

    Description

    The project consists of the construction of a second tunnel tube, located on the comprehensive Trans-European Transport Network (TEN-T), connecting the A2 motorway in Slovenia with the A11 motorway in Austria. The current single-tube tunnel with two-way traffic does not meet the minimum safety requirements for tunnels in the TEN-T. The construction of a second tunnel tube, combined with the comprehensive renovation of the existing tunnel tube, will ensure that the mandatory safety requirements under Directive 2004/54/EC are met. The project is also expected to improve traffic flow on the network connecting Central Europe with the Balkans.

    Objectifs

    The project will lead to increased safety standards, in line with EU requirements, and in turn to a reduced likelihood of traffic accidents as well as to reduced waiting times for domestic and cross-country traffic, often significant due to frequent queues on both sides.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 90 million

    Coût total (montant approximatif)

    EUR 202 million

    Aspects environnementaux

    The project is expected to have a positive impact by reducing carbon dioxide (CO2) and pollutants (Nitrogen Oxide - NOx, hydrocarbons and dusts) emitted in the air by queuing vehicles. With regards to the excavation material, landfills have been identified and relevant approvals have been obtained or approval is in progress. The impact is otherwise deemed as minor or moderate (as to e.g. underground water or dust in the air during the construction period) and relevant mitigation measures are foreseen.

    Passation des marchés

    The public procurement tender for the project was published in the Official Journal of the European Union on 14.12.2017 under the number: 2017 / S 240-497526. The Bank will confirm during the appraisal that the project has been tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC, where applicable, as well as Directives 89/665/EEC, Directive 2014/24, and Directive 89/665/EEC) as interpreted by the Court of Justice of the EU.

    Statut

    Signé - 13/02/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Transports