    Référence: 20170795
    Date de publication: 26 septembre 2018

    Promoteur – Intermédiaire Financier

    ACQUE VERONESI SCARL

    Lieu

    Description

    The aim of the loan is to support water and wastewater nfrastructure investments by Acque Veronesi Scarl, a fully owned public water utility serving 43 municipalities in the Province of Verona (Veneto Region, Italy) in the period 2018 - 2021.

    Objectifs

    The investments will deliver substantial health advantages and environmental quality improvements in the form of a more rational use of water resources and increased service quality. Moreover, the project is expected to increase resilience against the effects of climate change, and to generate energy savings, thereby contributing to climate change adaptation and mitigation.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 30 million

    Coût total (montant approximatif)

    EUR 115 million

    Aspects environnementaux

    The project is driven by the need to ensure compliance with EU and national environmental legislation. The project is expected to have positive net environmental and social impact, considering the focus on compliance and resource efficiency. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.

    Statut

    Signé - 19/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Eau, assainissement