Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170715
    Date de publication: 29 août 2018

    Promoteur – Intermédiaire Financier

    EUREKA SHIPPING HOLDINGS LTD

    Lieu

    Description

    The project involves the construction of three cement carrier vessels for the promoter's fleet. The vessels will be constructed and operated in compliance with the International Maritime Organisation (IMO) and EU regulations and will operate under an EU flag.

    Objectifs

    The project vessels will serve northern European ports, predominantly in the Sulphur Emission Control Areas (SECAs) of the Baltic and North Sea.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 10 million

    Coût total (montant approximatif)

    EUR 29 million

    Aspects environnementaux

    The project will support the transport of cement via short-sea shipping. As the alternative transport mode would be road transport, the project contributes to a more sustainable modal split in Europe and helps reducing the overall climate impact of transport. In addition, the project will contribute to the improvement of the environmental performance of the promoter's fleet, with the new vessels operating with significantly better fuel efficiency and reduced emissions of air pollutants. Therefore, the project contributes to sustainable transport and climate change mitigation, in line with the Bank's Transport Lending Policy as well as with EU and EIB objectives on Climate Action.

    Passation des marchés

    The promoter is a private company not operating in the utilities sector, and is thus not covered by EU Directives on procurement. Procurement was completed through a negotiated procedure between the ship owner and a number of shipyards. The procurement procedures followed by the promoter are suitable for the project and satisfactory to the EIB.

    Statut

    Signé - 7/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Chypre Transports