Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170647
    Date de publication: 13 décembre 2017

    Promoteur – Intermédiaire Financier

    GREENALIA SA

    Lieu

    Description

    The project concerns the construction of a 50 MWe electricity only biomass plant in Galicia, Spain. The plant will use 100% forestry residues in wood chip form, which will be sourced from the region in a 100 km radius around the plant.

    Objectifs

    The generation of electricity using renewable sources supports the EU objective of climate change mitigation. By ensuring demand for forest wood residues, the project will provide potential mitigation against incidences of forest fires in the region of influence, and will contribute to the sustainability of its forestry and overall economic activity.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 60 million

    Coût total (montant approximatif)

    EUR 130 million

    Aspects environnementaux

    The project falls under Annex II of the EIA Directive 2011/92/EC, leaving it to the competent national authority to determine the need for an Environmental Impact Assessment (EIA). The project has undergone an EIA which has been completed and has been submitted to the competent authorities. The promoter is expecting environmental permit to be issued before the end of 2017. The Bank will assess environmental aspects of the project during appraisal.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/23/EU / 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation referenced above as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 25/07/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Espagne Énergie