The project comprises of the construction and operation of a greenfield bakery plant in Poland.
Objectifs
The project consists of the construction and operation of a new bakery manufacturing plant with three burger buns, hot dog rolls production and packing lines, a line for whole grain and artisan products as well as all the required up and downstream infrastructure.
Secteur(s)
- Industrie - Industrie manufacturière
Montant BEI envisagé (montant approximatif)
EUR 40 million
Coût total (montant approximatif)
EUR 80 million
Aspects environnementaux
The main emissions expected for the project are the emissions to the air, waste and wastewater. The overall management of the waste produced by the project will be assessed during the appraisal. The wastewater components of the project are expected to be within the legal requirements for such an activity. Compliance with the environmental "acquis" (EIA, IED, SEVESO, etc.), availability of building and operating permits, as well as the compliance of the technology to be employed with the Best Available Techniques (BAT) will be assessed during appraisal. Any possible Habitat issues will be verified.
Passation des marchés
The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (Directive 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU), where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU), where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.
Statut
Signé - 26/06/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).