Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170262
    Date de publication: 1 juin 2018

    Promoteur – Intermédiaire Financier

    UNIVERSITATEA POLITEHNICA DIN BUCURESTI

    Lieu

    Description

    The project consists of financing investments for Bucharest Polytechnic University in Romania. The investments concern building research and teaching facilities for the Faculty of Aerospace Engineering and the Faculty of Applied Chemistry and Materials Science.

    Objectifs

    This project is part of a longer term modernisation programme of the University and is well aligned with the National Strategy for Research and Innovation for the period 2014-2020. One of the objectives of the modernisation is opening up the University for cooperation with domestic and international public and private research, non-research actors and active contribution to the European Research Area (ERA) and the European Higher Education Area.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 25 million

    Coût total (montant approximatif)

    EUR 51 million

    Aspects environnementaux

    The Directive 2011/92/EU amended by 2014/52/EU does not specifically mention the need for an Environmental Impact Assessment (EIA) for buildings relating to education, but it may be that some sub-projects can be regarded as urban renewal projects (Annex II of the European Directive). This will be studied in detail during the appraisal. The possible impact on natural sites will be checked during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU as well as Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 9/07/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Éducation