Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170211
    Date de publication: 15 novembre 2017

    Promoteur – Intermédiaire Financier

    MONTENEGRO

    Lieu

    Description

    The project includes five road rehabilitation and improvement schemes up to approximately 180 km. It is part of the Montenegro reconstruction programme of the Traffic Directorate of the Ministry of Transport and Maritime Affairs for main roads at over 200 km over a period of three years. The project also includes the reconstruction and rehabilitation of several bridges and tunnels and the construction of climbing lanes and a boulevard. It aims at improving transport conditions, including level of service and safety.

    Objectifs

    The project is expected to promote regional and national economic growth, facilitate trade, support private sector development, and ultimately contribute to economic and social cohesion in the region. The project is in accordance and pursuing the objectives of the Pre-Accession support and support for EU External Policies in the Neighbourhood/Partnership Countries. The project is expected to improve connectivity and reinforce the integration between the Western Balkans region and the EU, and strengthen the country's competitiveness in line with the 2017 Transport Community Treaty. The operation shall become part of the Economic Resilience Initiative (ERI), following its endorsement by the European Council and the European Parliament.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 185 million

    Aspects environnementaux

    The individual schemes of the project are investments of small and medium size for the reconstruction of existing roads. As overall alignments are to be maintained and there is limited construction of climbing lanes, the project is likely to have limited environmental and social impacts. In the situation where these schemes were located in the EU, they would likely fall under Annex II of EIA Directive 2011/92/EU as amended and therefore be subject to screening. Appropriate screening procedures, also in relation to natural habitats and protected species, as well as land acquisition and/or resettlement, will be put in place. An appropriate Resettlement Policy Framework will be developed to address potential physical or economic displacement of affected households.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 28/11/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Monténégro Transports