    Référence: 20170206
    Date de publication: 1 juin 2018

    Promoteur – Intermédiaire Financier

    STATE ROAD AGENCY OF UKRAINE (UKRAVTODOR),UKRZALIZNYTSIA

    Lieu

    Description

    The project consists of a framework loan for the financing of a series of small-scale transport projects addressing transport bottlenecks in Ukraine.

    Objectifs

    The framework loan will finance investment in small-scale transport infrastructure projects, defined as less than EUR 20 million on a standalone basis, that address 'transport bottlenecks' on the European transport networks in Ukraine. The investment is designed to improve connectivity in the Eastern neighbourhood, provide valuable support for small-scale transport investment for projects with significant positive impact locally, and help to realise projects that can deliver tangible results for citizens. In addition, the investment is expected to improve road safety and have positive impact on economic development.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 101 million

    Coût total (montant approximatif)

    EUR 110 million

    Aspects environnementaux

    If situated in the EU, some of the infrastructure schemes may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and a screening by a competent authority would be required to determine whether an EIA were required. The environmental process followed for the individual schemes and compliance with the Bank's environmental and social standards will be assessed during the project appraisal and the subsequent individual scheme allocation appraisals.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 17/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Ukraine Transports