Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170206
    Date de publication: 1 juin 2018

    Promoteur – Intermédiaire Financier

    STATE ROAD AGENCY OF UKRAINE (UKRAVTODOR),UKRZALIZNYTSIA

    Lieu

    Description

    The project consists of a framework loan for the financing of a series of small-scale transport projects addressing transport bottlenecks in Ukraine.

    Objectifs

    The framework loan will finance investment in small-scale transport infrastructure projects, defined as less than EUR 20 million on a standalone basis, that address 'transport bottlenecks' on the European transport networks in Ukraine. The investment is designed to improve connectivity in the Eastern neighbourhood, provide valuable support for small-scale transport investment for projects with significant positive impact locally, and help to realise projects that can deliver tangible results for citizens. In addition, the investment is expected to improve road safety and have positive impact on economic development.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 65 million

    Coût total (montant approximatif)

    EUR 110 million

    Aspects environnementaux

    If situated in the EU, some of the infrastructure schemes may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and a screening by a competent authority would be required to determine whether an EIA were required. The environmental process followed for the individual schemes and compliance with the Bank's environmental and social standards will be assessed during the project appraisal and the subsequent individual scheme allocation appraisals.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 17/12/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Ukraine Transports