Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170119
    Date de publication: 22 mars 2017

    Promoteur – Intermédiaire Financier

    FORESIGHT GROUP LLP

    Lieu

    Description

    Investment fund focusing on equity investments in infrastructure projects mainly in the UK and other European countries

    Objectifs

    The fund's strategy is to capture the long-term market opportunities driven by the transformation occurring in European and also global energy markets. The fund is targeting investments in (i) renewable energy projects and (ii) enabling infrastructure for renewable energy, such as flexible generation and storage as well as interconnection and transmission.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    GBP 67 million (EUR 78 million)

    Coût total (montant approximatif)

    GBP 500 million (EUR 576 million)

    Aspects environnementaux

    Most of the fund's underlying infrastructure investments will either require a full environmental impact assessment (EIA) or a screening decision by the national competent authority to determine whether an EIA is required or not. The legal documentation to be entered into by the Bank will require the fund to ensure that its underlying investments respect the relevant EU directives and the environmental and social standards of the Bank.

    Passation des marchés

    The fund's investment guidelines will be required to ensure that procurement procedures applied by the underlying investments financed by the fund are in line with the provisions of the relevant directives. Most, if not all, of the projects financed by the fund are expected not to be subject to public procurement procedures as outlined in Directive 2004/17/EC or 2014/25/EU where applicable.

    Statut

    Signé - 17/01/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays de l’UE Énergie