Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170020
    Date de publication: 1 juin 2017

    Promoteur – Intermédiaire Financier

    Rhein-Neckar-Verkehr GMBH

    Lieu

    Description

    The project consists of the renewal of part of the tramway fleet of operator Rhein-Neckar-Verkehr GmbH (RNV), providing public transport services in the Rhine-Neckar region around the cities of Heidelberg, Mannheim and Ludwigshafen am Rhein, straddling the Federal States of Baden-Württemberg, Rhineland-Pfalz and Hessen in Germany.

    Objectifs

    The project aims to enable sustainable and resource-efficient transport by improving comfort and energy efficiency and reducing noise emissions thanks to the replacement of old trams with new and better tram rolling stock.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 132 million

    Coût total (montant approximatif)

    EUR 265 million

    Aspects environnementaux

    The construction of the new tram rolling stock does not fall within the scope of the Environmental Impact Assessment (EIA) Directive since it will take place in the manufacturer's plants. If the project includes the construction of depots, then compliance with the EIA Directive will be assessed and, if needed, the Bank's loan will be conditional to obtaining the necessary environmental screening decisions, approvals or permits. The project is expected to deliver positive environmental benefits thanks to the new trams' improved energy efficiency.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 5/06/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Transports