Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170017
    Date de publication: 18 juillet 2018

    Promoteur – Intermédiaire Financier

    AGENTIA PENTRU EFICIENTA ENERGETICA

    Lieu

    Description

    The operation is a framework loan (FL) in support of sustainable energy efficiency improvements targeting public and residential buildings in various cities in the Republic of Moldova. Part of the allocations under the FL has already been identified ex ante and consists of the refurbishment of 139 public buildings. The remainder of the pipeline of allocations will be further developed by the Energy Efficiency Agency and the promoter, with advisory support.

    Objectifs

    The main objective of this operation is to increase the energy efficiency of public and residential buildings, which has a significant impact on CO2 emission reduction and thus contributes to climate change mitigation. Moreover, energy efficiency investments will boostlocal and regional economic activity, particularly in the construction industry, and therefore support the development of the private sector in general and SMEs in particular.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 70 million

    Coût total (montant approximatif)

    EUR 80 million

    Aspects environnementaux

    This operation intends to bring environmental benefits by supporting projects that reduce energy consumption in public and residential buildings, thus helping to mitigate climate change as well as to improve comfort for users. The individual schemes to be financed are likely to be small and are expected to have very limited negative environmental impacts, if any at all. Given the scale, location and nature of the schemes in built-up urban areas, EIA, as defined under the EIA Directive 2011/92/EU amended by the EIA Directive 2014/52/EU, would normally not be required. The building refurbishment will be consistent with relevant legal and regulatory requirements and in particular the Energy Efficiency Directive 2012/27/EU and the Energy Performance of Buildings Directive 2010/31/EU.

    Passation des marchés

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 10/12/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Rep. De Moldova Industrie