Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160560
    Date de publication: 10 mai 2019

    Promoteur – Intermédiaire Financier

    THE CITY OF KATOWICE

    Lieu

    Description

    The project consists of the construction in Katowice of an interchange between the DK81/DK86 national roads and the A4 motorway as well as a separate-grade solution at Armii Krajowej Street.

    Objectifs

    The project concerns two components, component I and IV, of an overall upgrade scheme for DK81 with four components in total. Component I and IV are the most important elements in the overall scheme as they will remove the major bottlenecks in the ring road system. Component I consists of the enlargement and reconstruction of the national roads DK81 and DK86 together with the construction of its interchange improving the connection between DK81, DK86 and the Trans-European Transport Network (TEN-T) motorway A4. Component IV consists of the construction of a separate-grade interchange on national road DK81 in the junction with Armii Krajowej Street. The project is located in a Convergence region and will improve a strategic link in the city arterial road system creating a direct connection to TEN-T. This project has a high priority in urban, regional and national transport planning strategies. It will contribute improved accessibility, safety and mobility for all road users, reduced congestion and related local impacts on the environment.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    PLN 52 million (EUR 12 million)

    Coût total (montant approximatif)

    PLN 409 million (EUR 96 million)

    Aspects environnementaux

    The closest Natura 2000 area is located 15 km from the project. The project is located in the immediate vicinity of an area granted statutory protection, the Zrodla Klodnicy reserve. Mitigation measures will be implemented to protect the reserve's water bodies.

    Passation des marchés

    The promoter has tendered works and supervision contracts in accordance with the relevant applicable EU procurement legislation, with publication in the Official Journal of the EU in 2017. The contracts for the works of Component I and IV were signed in April 2018 and January 2018 respectively. The contract for the supervision of both components was signed in September 2017. Open procedures for works and supervision applies. Under these conditions, the procurement procedures followed by the promoter are suitable for the project and satisfactory to the EIB.

    Statut

    Approuvé - 21/06/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports