    Référence: 20160474
    Date de publication: 11 octobre 2016

    Promoteur – Intermédiaire Financier

    ALPERIA SPA

    Lieu

    Description

    Investments in Alperia's hydroelectric power plants located in the province of Bolzano in the north-east of Italy

    Objectifs

    To maintain or improve the reliability and safety of existing renewable energy facilities and to increase electricity production through improvements in plant and equipment efficiency

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 80 million

    Coût total (montant approximatif)

    EUR 162 million

    Aspects environnementaux

    The project includes some facilities that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), which requires the competent authority to determine the need for an EIA. As the plants already exist and have been operating for some time, the main impact that can be expected relates to noise nuisance and other disturbance during construction. According to the promoter, an environmental study could be required for the plant where the dam height will be increased to improve flood management. For the asbestos removal a special permit is required. The appraisal will focus on these aspects and on the promoter's environmental capacity and work procedures.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of ender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 6/12/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Énergie