Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160441
    Date de publication: 29 novembre 2016

    Promoteur – Intermédiaire Financier

    NAVARRA DE SUELO Y VIVIENDA SA

    Lieu

    Description

    EIB loan to finance the construction of energy-efficient social housing units in Navarra, Spain

    Objectifs

    The project will finance the construction of new social housing units with high energy-efficiency standards in the region of Navarra. As well as providing affordable housing, the buildings will meet requirements set for nearly zero-energy Buildings (NZEB), thereby reducing energy consumption and lowering CO2 emissions.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 80 million

    Aspects environnementaux

    Through the project several new social housing nearly zero-energy buildings, as per the requirements of the EU Directive on the energy performance of buildings 2010/31/EU (EPBD), will be constructed in existing built environments. After completion energy consumption and pollutant emissions will be reduced compared to the business-as-usual scenario (in compliance with the current regulation).

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not operating in the utilities sector and not having the status of a contracting entity, thus not subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 6/07/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Services